Addendum/Revisions Checklist

IDOT reserves the right to make changes or revisions. It is the contractor's responsibility to determine which, if any, addenda pertain to any project they may be bidding. Failure to incorporate all relevant addenda may cause the bid to be declared non-responsive.

It is the contractor's responsibility to determine which, if any, addenda pertains to any project they may be bidding. Failure to incorporate all relevant addenda may cause the bid to be declared unacceptable.  Each addendum is hosted below with a revised PDF of the original plans and proposals. Addenda will also be placed on the Addendum Checklist and subscription service subscribers will be notified by email of each addendum issued.  The Internet is the department's primary way of doing business. The subscription server emails are an added courtesy the department provides. It is suggested that bidders review this page before submitting final bid information.

IDOT is not responsible for any email related failures.

The plans and/or proposal packages have been revised or amended for the following letting items. Bidders should verify that they have received and incorporated the changes prior to submitting their bid. Failure by the bidder to include an addendum could result in a bid being rejected as irregular. To view originals please navigate to Plans and Proposals.

Each addendum is identified in alphabetical order for each letting item. For instance, if item 11 has three addenda, each planholder of item 11 should have incorporated ADD A, ADD B, and ADD C. Items that have been revised are marked on the list with an "REV." If an item has been deleted from the letting, it is marked on the list as "DEL". If an item has been withdrawn from the letting, it is marked on the list with "WD." No bids are accepted on withdrawn or deleted items.

Need Help?

Jim Layden
(217) 782-7806
Jim.Layden@illinois.gov
Chief Contracts Official
Bureau of Design and Environment
Division of Highways

July 29, 2016 Addendum / Revisions

Contract-ItemFirstDateSecondDateThirdDate
06A-WI057ADD A7/27/16
09A-CA018ADD A7/21/16
10A-KE014ADD A7/26/16
18A-WA071ADD A7/27/16
19A-LE050ADD A7/13/16
20A-RO026ADD A7/13/16
22A-RO027ADD A7/13/16
005DEL
006-60Y38ADD A7/22/16
007-60Y65ADD A7/22/16
008-60Y92ADD A7/21/16
014DEL
020-62A65ADD A7/22/16
021-62A66ADD A7/22/16
022-62B01ADD A7/19/16
023-62B29ADD A7/19/16
025-62C04ADD A7/27/16
040-68B45ADD A7/14/16
053-72J25ADD A7/14/16
054-72J26ADD A7/20/16
057-76481ADD A7/21/16
058DEL
059DEL
065-78507ADD A7/21/16ADD B7/25/16
074-89417ADD A7/14/16ADD B7/25/16
080-95788ADD A7/21/16
087-61C82REV7/22/16
093-61C98ADD A7/25/16
096-85640ADD A7/21/16
097-91539ADD A7/21/16
105-78452ADD A7/15/16