LaSalle County - US 6 and IL 178 Intersection Improvement

The Illinois Department of Transportation (IDOT) is conducting a Preliminary Engineering and Environmental
(Phase I) Study for the purpose of improving the existing signalized intersection. The intersection of US 6 and IL 178 is located in the Village of North Utica, LaSalle County This existing signalized intersection is under the jurisdiction and maintenance of IDOT.

Note: IDOT projects typically have three distinct phases. Phase I (or the project Study) consists of developing the project scope, environmental studies and preliminary design of a project. Phase II (Design) consists of refining the design to develop contract plans and land acquisition. Phase III (Construction) consists of the actual construction of the project.

 

The study has considered various options to improve traffic flow at the intersection and has reviewed the costs, safety, user benefits and environmental impacts to arrive at the proposed scope of work. The proposed scope of work for this project is to convert the existing temporary traffic signal installation to a modern single lane roundabout. The roundabout will include splitter islands on all legs, a truck apron for large truck movements, improved drainage, lighting, landscaping, pavement markings and signing. The proposed roundabout is anticipated to reduce injury and fatality crashes and to match or exceed the traffic capacity of a comparable traffic signal installation. The construction of the improvement is proposed to be built in stages without any road closure. Access to local residences and businesses will be maintained throughout construction and any necessary entrance closures shall be coordinated with the owners. Minimal acquisition of permanent right-of-way and easements are needed. There will be no significant environmental impacts as part of this construction process.

Location Map

Phase I - In Progress

  • Intersection Design Study
  • Various Phase I studies and Reports
  • Local agency coordination
  • Cost estimate
  • Project approval

Phase II

  • Detailed Plans
  • Purchase of any necessary property

Phase III

  • Construction

A Phase I Project Report is being prepared to determine the environmental impacts of this project. No significant impacts are anticipated. The final report will document all identified impacts.

As the US 6 and IL 178 Roundabout project study progresses, IDOT will periodically update this website to assure that local residents and the motorists of Illinois are kept informed of project developments, public involvement opportunities, and construction related activities.

Contact Us

This website has been set up to provide residents, business owners and travelers with the information they need to know what is happening at the project location.

If this site has not answered all of your questions, please email us at shaun.dondelinger@illinois.gov or mail to:

Illinois Department of Transportation
700 E. Norris Drive Ottawa, IL, 61350

Please continue to visit the US 6 and IL 178 Roundabout Project Study website for periodic updates throughout the course of the project. The Illinois Department of Transportation looks forward to your continued input and support.

IDOT is currently at the early stages of Phase I for this project. As we make changes, this website will be updated accordingly.